I have a 4 stack Mira HV25 with Mira BMS Battery system, currently sitting on concrete garage floor. I want to place the stack on a purpose made stand -about 300mm high to avoid possible water damage from flood water.
My query is if I turn everything off(following video by Will in this forum) then disconnect all cables , relocate battery stack on stand in same floor position, then reconnect, can I then just start up (again following video) and will the system reboot automatically or are there other issues that might occur?? Or should this be done by an expert. I am reluctant to use the original installer as they were rubbish.
Cheers and thank you.
Shut down/restart advice
-
- Posts: 1802
- Joined: Thu Oct 13, 2022 7:21 pm
You can do exactly that, things to be very mindful of -
take a picture of the batteries and the wiring before you start,
make sure that the batteries are re-stacked in the same order as they were and do not change the dip switch settings.
be careful with the DC cables - you'll have over 200V dc when all of them are wired together
the comms cables are connected from BMS to battery 1 RS485-1, the inter-connects are wired from RS485-2 to RS485-1 on the next battery and repeat until all are connected.
make sure you earth the batteries and connect the earth to the earth connector on the right side of the inverter
take a picture of the batteries and the wiring before you start,
make sure that the batteries are re-stacked in the same order as they were and do not change the dip switch settings.
be careful with the DC cables - you'll have over 200V dc when all of them are wired together
the comms cables are connected from BMS to battery 1 RS485-1, the inter-connects are wired from RS485-2 to RS485-1 on the next battery and repeat until all are connected.
make sure you earth the batteries and connect the earth to the earth connector on the right side of the inverter