I have a KH10 and EP12 setup. I have a scenario where I want the inverter not to 'self-use' when there is high drain on my house load (e.g. when my EV charger kicks in). I'd like a work mode where I can specify that if the house load is > xx kW, then go into backup mode or force charge.
Is there a way to do this without rewiring or moving the CT clamp after splitting off the EV charger?
If not, I wonder if this can be added to the backlog?