Re: EPS-box-sp changeover time
Well done for rumbling them!

It will be helpful for anyone else thinking of the EPS box (I was thinking for the future)
Meanwhile I am sure those little UPS's will do you fine for the few moments you do have a power loss.
Re: EPS-box-sp changeover time
agreed and accepted but that has cost me another £200 which I should not have had to shell out for something that was technically and, I am sure legally mis-sold.....but I dont have the resources to pursue that and no doubt would not win against them
14 x Aiko Neostar 2p plus 475W panels (6.65 kWP)
Fox EP12 10.4kW usable battery
FOX KH7 7kw hybrid inverter
EN-EPS-BOX-SP gateway
Re: EPS-box-sp changeover time
Yes it would leave a sour taste in my mouth also.

On a side note, in your other thread, did you sort the G100 State 3 fault?
Re: EPS-box-sp changeover time
sort of.....just replied to that
14 x Aiko Neostar 2p plus 475W panels (6.65 kWP)
Fox EP12 10.4kW usable battery
FOX KH7 7kw hybrid inverter
EN-EPS-BOX-SP gateway
Re: EPS-box-sp changeover time
davidwf15 wrote: Tue Mar 31, 2026 7:11 pm An unexpected power cut tested out the new installation today...and I am not happy
Do you have any insights for user janu...
Their box activated last night, and I have no idea what the red lights mean?
viewtopic.php?p=15733#p15733
Post Reply