Hello from Poland

Welcome to the forum, feel free to say hi and show off your installation photos and share your experience.
Post Reply
adalbert
Posts: 1
Joined: Sun Mar 23, 2025 3:25 pm

Hello from Masuria Lake District,
New installation - completed on March 20th:

- 44 x Tiger Neo JKM450N-54HL4R-V panels (PV 19.8 kWp)
- Miellec Tower 2800-7 battery (LiFePO4 cells)
- FoxESS H3-PRO-15.0 inverter
- Feeding a Bosch Compress 7000i AW 5–17 kW heat pump

Despite the unfriendly climate and relatively low PVOUT (1100), we’ve achieved nearly 90% self-sufficiency since launch. That said, the building is still unoccupied, as interior finishing is ongoing. I’m maintaining an internal temperature of around 15°C, but domestic hot water is not yet in use, and the recuperation unit with heat recovery is also not operational.

We plan to open for guests in August or September, so by the end of calendar year 2025, we should have a much clearer picture.

We’re using a two-zone tariff system:
- Peak prices apply between **6:00–13:00** and **15:00–22:00**, Monday through Friday
- Off-peak prices apply during the remaining hours and the entire weekend

This means most of our high-demand periods are covered by direct PV consumption and battery discharge. With nighttime temperatures ranging from -2°C to +2°C, the battery typically drops to around 10% capacity by 3:00–4:00 a.m.

So far, so good — but there’s definitely room for expansion.

Next season, I’m planning to add a carport/shed next to the workshop building (the one in the center) and extend the kitchen to the west side of the barn. This would provide additional roof area for future PV expansion.
Attachments
IMG_1562.jpeg
IMG_1558.jpeg
User avatar
Will
Site Admin
Posts: 406
Joined: Thu Oct 13, 2022 5:56 pm

Nice setup and welcome.
Community Admin / FoxESS Elite Professional

Buy me a coffee or Book a zoom meeting for remote consultancy

FoxESS Tri Inverter Installation
2 x KH Series Inverters
24 x HV2600 (62.4kWh)
32 x 490w across 4 arrays
Dual Tesla Household
Heatpump & Low Carbon Housebuild
Post Reply