Hi.
As I understand it If I oversize hybrid inverter (H1-6.0-E-G2) beyond my export limit (5kw) the 1kw difference can be fed into the battery or house.
Is there an idiot proof guide/way to limit the battery charge for summer so I don't fill the battery before I exceed the export limit. If so could someone point me in the right direction!
Also given the 90% DOD on the eg EP11 would that mean to set the battery to retain 10% usable charge after a force discharge I need to set it to 10% or 20%?
Thanks
J
As I understand it If I oversize hybrid inverter (H1-6.0-E-G2) beyond my export limit (5kw) the 1kw difference can be fed into the battery or house.
Is there an idiot proof guide/way to limit the battery charge for summer so I don't fill the battery before I exceed the export limit. If so could someone point me in the right direction!
Also given the 90% DOD on the eg EP11 would that mean to set the battery to retain 10% usable charge after a force discharge I need to set it to 10% or 20%?
Thanks
J