Force discharge to grid

Post Reply
Luke
Posts: 7
Joined: Mon Nov 28, 2022 9:41 pm

Does anyone know if it's possible to force discharge these back to the grid? Seems force charge from grid is an option within the cloud interface but aside from that I can't see anything in the manual but i'm far from an expert!
User avatar
Will
Site Admin
Posts: 208
Joined: Thu Oct 13, 2022 5:56 pm

Now supported on latest firmwares.
Community Admin / FoxESS Professional

Buy me a coffee or Book a zoom meeting for remote consultancy

FoxESS Tri Inverter Installation
2 x KH Series Inverters
24 x HV2600 (62.4kWh)
32 x 490w across 4 arrays
Dual Tesla Household
Heatpump & Low Carbon Housebuild
Horsley1
Posts: 10
Joined: Wed Dec 14, 2022 1:53 pm

is this still correct. Have just seen a video from a SOlarEdge battery owner who force discharges to the Grid at the rate of 2.5kWh during the Octopus peak rate time (4-7pm) to maximise his returns. Can we do that with our FoxEss batteries?
calum
Posts: 389
Joined: Fri Feb 24, 2023 11:00 am
Location: Stockport

Will wrote: Tue Nov 29, 2022 8:54 pm FoxESS and just about all G99/G98 systems for UK use won't be able to discharge to grid sadly.
This seems an odd limitation when all our systems can feed in to the grid in the event of excess solar generation? I'm curious how battery sourced feed in would be any different, technically speaking?
H1-3.7 / 6xHV2600 / 14x400W / RS485 Modbus->HA
FoxESS Modbus HA Integration
Contact Fox here
RayJA
Posts: 1
Joined: Fri Sep 22, 2023 7:39 am

I was looking at this issue as I am considering ditching my FIT Export payment and going on the Octopus 15p per kw instead. I have added a new solar array recently which I get nothing for exports. I came across a very good article at

Blog.jonsdocs.org.uk then search for Solis Hybrid Inverter

Towards the end of the article the method used to force discharge the batteries is given. I haven’t yet tried it, but am fortunate enough to have the Solis Hybrid Inverter fitted in my system.

Fox AIO Hybrid system
4x Fox HV2600 v2 batteries - to be increased to 7 or 8, undecided
Solis 3kw Hybrid Inverter
4.6 kw Solar in 2 arrays - to be increased to 8kw subject to planning consent for solar carport
Hyundai Kona 64Kw
Ohme ev charger
Daikin monobloc 7Kw ASHP being fitted January ’24.
VinceK
Posts: 2
Joined: Sat Feb 10, 2024 10:46 am

Will wrote: Tue Nov 29, 2022 8:54 pm FoxESS and just about all G99/G98 systems for UK use won't be able to discharge to grid sadly.
I just joined the forum, and am also interested in forced discharge. Will, your post was 12 months back, have things changed.

Is there any documentation for the force charge/discharge features. I would think the grid would want you to discharge slowly over the 4-7pm time window, rather than have everyone dump maximum amount at 4pm. I have a 6Kw grid limit, 12Kw battery, so could dump 1/2 my battery in the first hour.

Also, I assume you set the upper and lower limits on the inverter for how much charge you want to force discharge.
Last edited by VinceK on Sun Feb 25, 2024 3:38 pm, edited 1 time in total.
KH10, 24x435w panels, 20kWh of ECM/C4300 battery’s.
reef
Posts: 76
Joined: Sat Sep 09, 2023 10:06 am
Location: East Yorkshire

Things have changed yes. Since around October time the newest firmware on the H1 inverters has allowed force discharge to the grid and last month the KH inverters also gained the ability I believe.
RedBaron
Posts: 8
Joined: Mon Jan 02, 2023 1:58 pm

Presumably the main concern over force discharge is not exceeding the total output power approved by your DNO under your G98/99, but since the H1 inverters can control total export anyway when solar producing, they presumably can enforce this cap even when battery force discharging. Otherwise the risk of exceeding the cap would come from when you are force discharging as well as solar producing.
User avatar
lessa
Posts: 2
Joined: Wed Feb 21, 2024 2:20 pm

reef wrote: Tue Feb 13, 2024 10:50 pm Things have changed yes. Since around October time the newest firmware on the H1 inverters has allowed force discharge to the grid and last month the KH inverters also gained the ability I believe.
What are these firmware versions for the H1?

My systems was installed on earlier October and uses
Master: 1.63
Slave: 1.02
Manager: 1.68
Kind regards,
Lessa
H1-3.7-E
ECS2900-2 with two slaves
11 Jinko Tiger Neo 420W (4.62kWp)
5x TIGO Optimisers due to three roof distribution
reef
Posts: 76
Joined: Sat Sep 09, 2023 10:06 am
Location: East Yorkshire

lessa wrote: Wed Feb 21, 2024 2:44 pm
reef wrote: Tue Feb 13, 2024 10:50 pm Things have changed yes. Since around October time the newest firmware on the H1 inverters has allowed force discharge to the grid and last month the KH inverters also gained the ability I believe.
What are these firmware versions for the H1?

My systems was installed on earlier October and uses
Master: 1.63
Slave: 1.02
Manager: 1.68
Master and Slave versions are correct, but you need Manager 1.70 on the H1 for force charge/discharge.
User avatar
Will
Site Admin
Posts: 208
Joined: Thu Oct 13, 2022 5:56 pm

Just to update this thread.

Force discharge is now supported for H, K series when using the latest firmware.
Community Admin / FoxESS Professional

Buy me a coffee or Book a zoom meeting for remote consultancy

FoxESS Tri Inverter Installation
2 x KH Series Inverters
24 x HV2600 (62.4kWh)
32 x 490w across 4 arrays
Dual Tesla Household
Heatpump & Low Carbon Housebuild
Post Reply