DNO will not allow 23kWp export
Posted: Mon Nov 23, 2026 8:50 am
Hello,
I have a recently installed 45 panel domestic system capable of a potential 23kWp production. This is about 5 times the power consumption. I do not (yet) have either an electric car nor an air-source heat pump.Therefore at the moment I do not need battery storage.
My problem is that my DNO has throttled my export back to 10.5kW.
I guess that I have a couple of questions.
Firstly, is the 10.5kW limit a peak figure or an average over (say) 24 hours?
Secondly, what would be the potential cost benefit analysis of getting 3-phase?
Thirdly, has anyone else had this issue and, if so, how did you resolve it?
Many thanks in advance.
Kind regards,
Matt
I have a recently installed 45 panel domestic system capable of a potential 23kWp production. This is about 5 times the power consumption. I do not (yet) have either an electric car nor an air-source heat pump.Therefore at the moment I do not need battery storage.
My problem is that my DNO has throttled my export back to 10.5kW.
I guess that I have a couple of questions.
Firstly, is the 10.5kW limit a peak figure or an average over (say) 24 hours?
Secondly, what would be the potential cost benefit analysis of getting 3-phase?
Thirdly, has anyone else had this issue and, if so, how did you resolve it?
Many thanks in advance.
Kind regards,
Matt