Hello from the South East
Posted: Sun Feb 15, 2026 1:11 pm
Hello,
Just wanted to say hi. Had my system installed at the end of January '26.
10 x Eurener Nexa 475W TOPCon solar panels - 4 on the front (west facing) 6 on the rear (east facing)
H1-5.0-E-G2-WL Inverter
EQ2900 5.76 kWh Batteries
Now obsessed with monitoring the app and looking at the smart meter only drawing a few watts
. Waiting for the H1-G2-WL to come out of the 5 second refresh testing phase and firmware updates (requested Thursday).
On the Octopus Flux Import tariff but still waiting for confirmation that Export part is live (up to 6 weeks apparently according to their email).
Attached are pictures (cropped) of the install - please ignore the horrific table and colour of the render (next project). Batteries will have a form of enclosure built around them to keep the temps up if it ever stops raining. Will also look to install the cable covers when they go on sale.
Just wanted to say hi. Had my system installed at the end of January '26.
10 x Eurener Nexa 475W TOPCon solar panels - 4 on the front (west facing) 6 on the rear (east facing)
H1-5.0-E-G2-WL Inverter
EQ2900 5.76 kWh Batteries
Now obsessed with monitoring the app and looking at the smart meter only drawing a few watts
On the Octopus Flux Import tariff but still waiting for confirmation that Export part is live (up to 6 weeks apparently according to their email).
Attached are pictures (cropped) of the install - please ignore the horrific table and colour of the render (next project). Batteries will have a form of enclosure built around them to keep the temps up if it ever stops raining. Will also look to install the cable covers when they go on sale.