Shut down/restart advice
Posted: Thu Apr 24, 2025 2:20 pm
Hi colleagues
I have a 4 stack Mira HV25 with Mira BMS Battery system, currently sitting on concrete garage floor. I want to place the stack on a purpose made stand -about 300mm high to avoid possible water damage from flood water.
My query is if I turn everything off(following video by Will in this forum) then disconnect all cables , relocate battery stack on stand in same floor position, then reconnect, can I then just start up (again following video) and will the system reboot automatically or are there other issues that might occur?? Or should this be done by an expert. I am reluctant to use the original installer as they were rubbish.
Cheers and thank you.
I have a 4 stack Mira HV25 with Mira BMS Battery system, currently sitting on concrete garage floor. I want to place the stack on a purpose made stand -about 300mm high to avoid possible water damage from flood water.
My query is if I turn everything off(following video by Will in this forum) then disconnect all cables , relocate battery stack on stand in same floor position, then reconnect, can I then just start up (again following video) and will the system reboot automatically or are there other issues that might occur?? Or should this be done by an expert. I am reluctant to use the original installer as they were rubbish.
Cheers and thank you.