Re: Forecasting Solar Production

Thank you all for the pointer to SolCast , once set up with location, number of panels angle and directions it seems very accurate, time will of course tell!

I've gone for a simple solution with an automation running before midnight using

entity_id: sensor.solcast_pv_forecast_forecast_tomorrow ...
Thu Feb 27, 2025 6:40 pm
Replies: 5
Views: 16753
Jump to post

Re: Help With Helpers!

this might help

Code: Select all

{{ states('input_datetime.FD_SetWindowEndTime') }}
Fri Jan 10, 2025 12:42 pm
Replies: 7
Views: 9673
Jump to post

Re: Change the Work Mode based on battery SoC

Hi Andy,

Not saying this is more correct, but I have something similar working during summer when I set mode to Force Discharge at peak rate. It's also making use of a input_number.target_soc_force_export created as Settings > Device & Services > Helper tab, which allows playing with the value from ...
Tue Nov 12, 2024 8:19 am
Replies: 3
Views: 7099
Jump to post

Re: I'm trying to trigger on SoC level, help needed

thanks Dave,

The polling every 5 minutes against a condition works a treat, great idea! :idea: I don't think the trigger was firing at all on the state...

If it helps anyone else trying to achieve similar this is what I've gone with
Note: tweak vars with entity "workshop" and introduce input ...
Tue Jun 18, 2024 6:52 pm
Jump to post

I'm trying to trigger on SoC level, help needed

I'm hoping someone can help, I thought this would work after testing in the templates page but hasn't triggered.

Background for goal:
I've had automations setting the work mode based on the tariffs, so at the start of the peak rate I switch to Feed-In Priority, at the end of peak I switch back to ...
Mon Jun 17, 2024 7:14 pm
Jump to post

Re: BMS/Inverter battery cable connection parts

I see, that relates to the "pin contact" too, I have the plastic plugs. Thanks
Mon Feb 12, 2024 10:28 am
Forum: HV2600
Replies: 4
Views: 11996
Jump to post

BMS/Inverter battery cable connection parts

Hi,

Can someone point me to where to find parts for these connections, I've just bought longer 10 AWG cables to move batteries a bit further away from the inverter, I already have the spare plugs, it's just the metal inserts I need to crimp, do I just need a standard part with the correct diameter ...
Sun Feb 11, 2024 10:45 pm
Forum: HV2600
Replies: 4
Views: 11996
Jump to post

Re: Hello from South London

Thanks for the heads up on the inverter rating against charging/discharging the battery, I had it in my head that was the power rating for the PV, but now I've moved the batteries back with the H1-5.0 I see the benefit of handling surges such as kettles etc over the H1-3.7 👍

Load now looks as it ...
Thu Feb 08, 2024 9:07 am
Replies: 6
Views: 6655
Jump to post

Re: Hello from South London

Thank you for the explanation. You are absolutely right, when I see generation increase from the workshop the house load goes down, and can even become negative..

One thing I didn't mention, the batteries are still in the loft connected to the H3.7, I was was going to leave them there unless there ...
Thu Feb 01, 2024 5:35 pm
Replies: 6
Views: 6655
Jump to post

Re: Hello from South London

Hi Dave,

does that mean each is powering its own consumer unit so effectively one is in series with the other?

Don't think so. The Workshop (with "big inverter") -> feeds into a consumer unit in the workshop. The supply to/from that consumer unit goes into a 40A MCB breaker on the house consumer ...
Wed Jan 31, 2024 6:25 pm
Replies: 6
Views: 6655
Jump to post

Hello from South London

Our system has been evolving over the last few years

2018 - 8x 300W Jenkos
2021 - 2x HV2600 v1 batteries and the H1-5.0-E Inverter (6kW) was swapped in

Then last year, after coming across this forum, started thinking about the possibilities of increasing capacity. Bought 2x HV2600 v2 batteries ...
Tue Jan 30, 2024 5:51 pm
Replies: 6
Views: 6655
Jump to post

Setting Max SoC at different levels during the day to get the best from Octopus Flux tariff

Hi,

This is my first automation after finally setting up my HA (on old laptop using docker ) and the Modbus integration (using a 304 ), so I'm sure it can be improved on and very welcome to hear your comments!

The idea for this comes from wanting to maximise the savings by charging on Octopus ...
Jump to post

Re: BMS V2 with mixed v1/v2 batteries - Solution to persistent BMS alarms.

I'd like to add another successful (and very grateful!) +1 to modifying the supplied RS485 cable solution!

I'd installed the BMS V2 with 2x new V2 batteries in front of the 2x Version C I had previously.

For 3 nights I saw forced charging working fine with no errors, then errors started before the ...
Sat Nov 25, 2023 10:19 am
Jump to post